Similar Posts

- Advertisement -

8 Comments

  1. i’ve asked you this before..the last time you pimped this in this forum..and you never replied..

    (care to give it a go this time..?)

    please tell us how a dedicated busway..(that could be upgraded to driverless/solar-powered/whatever buses when/where needed)..

    and would cost a fraction of/be much faster to install..than ‘rail’..

    please tell us how/why this is not an alternative to rail – that at first look/on the surface is better in so many ways..?

    what am i missing here – that you can see..?

    1. is it arrogance or having no answers that causes lee to feel he has no need to answer what is a reasonable/rational query/questioning of his position..?

  2. +1
    Rail is such an obvious best long-term choice for a need that will be permanent (unless AT is planning to move the Airport..)

    Arriving at Heathrow in 1977, I remember the inconvenience of road transport. Leaving Heathrow in 1981, I remember the utter magic of the new Underground connection.

    This is the one sensible measure that tourism and Kiwis need.

    1. @ vino..a dedicated busway will provide that same fast/efficient service – at a fraction of the cost..and can be done in a fraction of the time..

  3. As a retired railwayman I would love to see how it could cost $160 million per kilometre to add a second track to the Onehunga Branch.

    Either fibs are being told or terrific rorting is happening.

    Thank you Mike Lee. Connecting the airport into the existing rail system is the rational answer.

  4. As a retired railwayman I would love to see how it could cost $160 million per kilometre to add a second track to the Onehunga Branch.

    Either fibs are being told or terrific rorting is happening.

    Thank you Mike Lee. Connecting the airport into the existing rail system is the rational answer.

Comments are closed.